Installation Steps
1. Site Selection: Choose a flat, open, and firm site, avoiding slopes or soft soil.
2. Mast Assembly: Connect each section according to the instructions, ensuring the latches are unlocked.
3. Base Securing: Place the base stably and secure it with ground stakes.
4. Equipment Installation: Secure the camera to the top of the mast, ensuring the cables are secure.
Vertical Adjustment
1. Manual Adjustment: Fine-tune using the string or leg tubes, observing that the level bubble is centered.
2. Prioritize Thicker Leg Tubes: Extend the mast starting with the thickest leg tube, avoiding using only the thinnest tube.
3. Avoid Center Column: The center column has poor stability; prioritize using the leg tubes to adjust the height.
Precautions
1. Safe Operation: Climbing the mast is prohibited; electrical equipment must be grounded.
2. Load Limit: Do not exceed 30kg; avoid localized stress. 3. Environmental adaptability: Stop using when the wind is strong and check the connections regularly.

